| 11610274 |
In addition to the requirements defined in the SJC Emergency Temporary Coastal Armoring Permit Requirements, PLEASE NOTE:
|
11/4/2016 2:52:51 PM * cgalloway
|
| 11610274 |
PLEASE NOTE THAT TEMPORARY COASTAL ARMORING PLACEMENT MAY RESULT IN A PERMENANT SITING FROM DEP. PLEASE CONSULT WITH DEP
|
11/4/2016 2:52:39 PM * cgalloway
|
| 11610274 |
NO EQUIPMENT IS AUTHORIZED TO REMAIN ON THE BEACH OVER NIGHT
|
11/4/2016 2:52:29 PM * cgalloway
|
| 11610274 |
ACCESS CAN BE OBTAINED DURING OUTGOING AND LOW TIDE
|
11/4/2016 2:52:16 PM * cgalloway
|
| 11610274 |
BEACH ACCESS IS AUTHORIZED AT SURSIDE, USINA(AKA REEF RESTAURANT, SOUTH PONTE VEDRA BEACH RECREATION AREA, AND EXXON STATION
|
11/4/2016 2:52:02 PM * cgalloway
|
| 11610274 |
CONSTRUCTION EQUIPMENT SHOULD REMAIN BELOW THE HIGH TIDE LINE WHEN TRAVELING
|
11/4/2016 2:51:53 PM * cgalloway
|
| 11610274 |
REMOVAL OF ALL CONSTRUCTION DEBRIS PRIOR TO THE END OF WORK DAY IS REQUIRED
|
11/4/2016 2:51:40 PM * cgalloway
|
| 11610274 |
PERMIT IN T.C.'S OFFICE
|
11/4/2016 2:51:25 PM * cgalloway
|